A Rowan company - serving Long Beach, CA

KraftMaid Home Additions & ADU Nationwide

Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

KraftMaid Home Additions & ADU: The Long Beach Owner’s Guide

We stock and install KraftMaid-compatible cabinet systems for home additions and ADUs across Long Beach, with typical installed project pricing from $45,000 to $130,000 for additions and $90,000 to $220,000 for standalone ADUs. Most Long Beach homeowners discover their KraftMaid components are failing when cabinet boxes swell near bathroom-adjacent walls, drawer glides stick in the salt air, or hinge plates corrode faster than expected in the coastal climate. In neighborhoods like Belmont Shore and the Peninsula, we’ve replaced KraftMaid hardware that looked fine inland but showed rust within four years of ocean exposure.

Call (424) 567-7009

Which KraftMaid Models This Applies To

KraftMaid’s product lines for secondary dwelling units and additions break into three tiers, and the parts are not interchangeable. The All Plywood Construction (APC) series uses 3/8-inch plywood boxes with solid-wood dovetail drawers; the Particleboard Construction line uses 1/2-inch engineered core with stapled joints; and the Vantage spec-grade line built for multi-family and rental ADUs uses metal clip assembly for faster field installation. The label is inside the upper right corner of the sink base or first wall cabinet, printed on a white sticker with a six-digit SKU starting with “KM” for residential or “KV” for Vantage.

We source OEM KraftMaid hardware through MasterBrand’s dealer network, but for coastal Long Beach ADUs we often spec Blum clip-top hinges with nickel-plated cups instead of standard zinc; the upcharge is $3-$5 per hinge and the lifespan difference is measurable. For drawer systems, the OEM 75-pound soft-close glide and the KV 8400 series aftermarket equivalent mount on identical 32mm hole patterns, though the KV’s ball-bearing race tolerances are slightly looser. We document which spec we install on the written scope, because “cabinet hardware” is not a precise enough line item for a project that should last twenty years.

Signs Your KraftMaid Home Additions & ADU Is Failing

Professional contractor spreading mortar for kitchen backsplash tile installation
Signs Your KraftMaid Home Additions & ADU Is Failing
  • Drawer fronts sag or detach from the box. KraftMaid’s standard drawer uses a four-sided dovetail with a 1/4-inch plywood bottom captured in a groove; in Long Beach’s humidity cycles, that plywood expands, contracts, and eventually fractures the groove walls. The drawer still looks intact until the bottom drops out under load.
  • Doors hang uneven or won’t stay closed. The Blum compact hinge used on most KraftMaid lines has a plastic bushing that degrades in UV, common in ADUs with south-facing kitchenettes. The hinge cup loosens in the 35mm bore hole, and the door drifts until the magnetic catch no longer meets the plate.
  • Finished surfaces bubble or delaminate near plumbing walls. KraftMaid’s standard thermofoil (vinyl wrap) handles steam poorly in compact ADU bathrooms where ventilation is undersized. The adhesive softens, the film lifts, and the MDF core swells. This is not a part failure you can swap; the door or drawer front needs replacement.
  • Corner joints in the cabinet box separate. Particleboard construction uses confirmat screws and dowels; the screws strip when the core material absorbs moisture from slab-on-grade ADUs in Long Beach’s older neighborhoods like Wrigley or North Long Beach, where vapor barriers were inconsistent.
  • Soft-close mechanism bangs or fails to engage. The Blumotion piston has a 50,000-cycle rating in dry climates. In coastal Long Beach, salt dust accelerates wear on the hydraulic seal, and the piston loses damping after three to four years of daily use, not the rated ten.
BeforeBefore
AfterAfter

Replacement Cost & What’s Included

Component Price Range (Installed) Typical Scope
KraftMaid cabinet door/drawer front replacement $180-$420 per unit Remove, match finish, install, align
Drawer box rebuild (dovetail hardwood) $140-$280 each New box, glide, front attachment
Hinge and plate replacement (full kitchen/ADU set) $320-$680 All doors, nickel-plated spec
Full cabinet box replacement (base or wall) $450-$950 each Demo, level, install, finish trim
Complete ADU kitchenette (KraftMaid APC, 8-10 units) $8,500-$18,000 Design, order, install, countertop coordination

What drives the range: finish grade (standard paint vs. custom glaze), box construction (particleboard vs. plywood), and whether the existing countertop must be disturbed to extract a base cabinet. We quote each line item in writing before ordering; under Clause 1 of The Haven Standard, the price is written before anyone starts. Our 365-Day Done Right Promise covers alignment, hardware function, and finish match. No change proceeds without a signed change order, which is the discipline that has kept our projects within a few percent of the agreed cost across 4,000-plus jobs since 2007.

DIY or Call Us?

Contractors installing custom wooden kitchen cabinets during a home remodeling project
DIY or Call Us?

An owner can safely check the model label, measure the hinge bore pattern (35mm for Blum, 26mm for older Grass), and confirm whether the drawer is dovetail or stapled construction. What goes wrong fast: drilling a new hinge cup freehand without a 35mm Forstner bit and jig, which guarantees misalignment and a door that never hangs true. Rebuilding a drawer box requires a dovetail jig and a table saw with a dado stack; without both, the joint fails under load. For ADU projects in Long Beach, permit compliance is the larger risk - electrical, plumbing, and structural modifications to create a legal dwelling unit require licensed trade work and inspection sign-offs. We pull permits, pass inspections, and document every step with a photo record you receive as standard, not an upgrade. Call (424) 567-7009 to schedule your free estimate.

Get the price in writing before anything starts.A real person answers, day or night.
Call now

FAQs

Need Construction help in Long Beach? Licensed & insured · Free in-home estimates response · free estimates
Call (424) 567-7009
Local Service Coverage

Request a Free Estimate in Long Beach

Tell us what you need - Rowan Construction Group Long Beach responds fast. No obligation.

By reaching out through this form, you agree to the terms of our Privacy Policy and agree to be contacted by telephone, text message, or email about your request, including by the independent contractors we may refer it to.

Prefer to text? Text Now
Call Now - 24/7 Dispatch