A Rowan company - serving Long Beach, CA

Schluter Home Additions & ADU Nationwide

Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Schluter Home Additions & ADU: The Long Beach Owner’s Guide

Schluter waterproofing and tile-setting systems are specified in most Long Beach home additions and ADU construction where wet areas meet living space, with typical installed integration costs running $45,000-$130,000 for the full addition and $90,000-$220,000 for standalone ADU construction. We stock Schluter-DITRA, -KERDI, and -SCHIENE profiles on our Long Beach trucks, and we can usually source same-day for active projects. Most owners discover a Schluter system concern during the rough-in inspection or after the first seasonal temperature swing, when membrane seams or profile transitions show stress.

Call (424) 567-7009

Which Schluter Models This Applies To

Schluter systems in home additions and ADUs fall into three functional groups, and identifying which one your project uses determines material compatibility and labor scope. The membrane group includes KERDI for shower and wet-area waterproofing, KERDI-DS for steam showers (thicker at 8 mil versus standard 4 mil), and DITRA for uncoupling under tile floors. The profile group covers SCHIENE edge strips, RENO transition profiles, and QUADEC corners. The drain group includes KERDI-DRAIN point drains and KERDI-LINE linear drains, each with flange depths that must match your slab or subfloor build-up.

To identify your specific part, check the printed code on the membrane roll edge or the stamped model number on aluminum profiles. KERDI membrane is orange-faced fleece; if your addition has a gray-faced membrane, it is likely a competitor product that requires different adhesive and seam treatment. For drains, the flange height is the critical spec: KERDI-DRAIN comes in 2-inch, 3-inch, and adjustable-height versions, and installing the wrong flange on a post-tensioned Long Beach slab can mean a complete re-pour. We source Schluter OEM for all membrane and drain components; for edge profiles, we sometimes use compatible extrusions from our KraftMaid and Cambria supply chain when color matching or lead time demands it, but we document the substitution in your written scope under Clause 1 of the Haven Standard.

Signs Your Schluter Home Additions & ADU Is Failing

Professional contractor spreading mortar for kitchen backsplash tile installation
Signs Your Schluter Home Additions & ADU Is Failing
  • Soft or discolored drywall near shower enclosures. This indicates KERDI membrane seam failure or improper overlap at the curb-to-wall transition. In Long Beach’s marine climate, salt-laden humidity accelerates wicking behind failed seams.
  • Grout cracking in straight lines above DITRA installations. The uncoupling membrane has either delaminated from the subfloor or was installed over a substrate with excessive deflection. We see this often in Belmont Shore additions where original 1950s joists were not sistered for the new tile load.
  • Visible rust staining at metal profile edges. SCHIENE or RENO profiles in wet areas should be anodized aluminum or brass; if standard aluminum was substituted, the salt air near the Port of Long Beach corrodes it within 18-24 months.
  • Standing water around drains with functional slope. The KERDI-DRAIN bonding flange has separated from the membrane, usually from incompatible sealant or skipped primer. This requires cutting back tile and re-membraning.
  • Musty odor in ADU bathrooms with no visible leak. Slow membrane breaches let moisture migrate into wall cavities. We find this in garage conversions where the original slab lacked proper vapor barrier and the Schluter system was asked to compensate.
BeforeBefore
AfterAfter

Replacement Cost & What’s Included

Scope Long Beach Price Range
Schluter membrane repair (localized, under 10 sq ft) $800-$2,500
DITRA replacement with tile reset (per 100 sq ft) $3,500-$7,000
KERDI shower rebuild (membrane, drain, tile) $4,500-$12,000
Full home addition with Schluter wet-area systems $45,000-$130,000
Standalone ADU with complete Schluter specification $90,000-$220,000

What drives the range: substrate condition (concrete versus wood, levelness, existing moisture content), tile size and pattern complexity, and whether the original installation was documented with photos. Under the Haven Standard, your written quote includes line-item breakdown of membrane, profiles, adhesive, and labor; no work proceeds on any change until the change order is signed. Our 365-Day Done Right Promise covers all Schluter installations, and you receive the documented photo record as standard.

DIY or Call Us?

Contractors installing custom wooden kitchen cabinets during a home remodeling project
DIY or Call Us?

There is safe checking and there is false economy. An owner can verify the printed Schluter product code against Schluter’s online spec sheet, measure flange heights with a tape, and photograph suspect areas for comparison. What goes wrong in DIY: KERDI membrane requires unmodified thin-set with specific open time; modified thin-set contains latex that prevents proper fleece bonding. DITRA installation demands a subfloor deflection under L/360, which most Long Beach homeowners do not have the equipment to verify. And any membrane work behind existing tile means demolition, which on a post-tensioned slab risks cable damage that can compromise the entire structure. We are an independent service provider, not affiliated with Schluter. If you are past the verification stage, call (424) 567-7009 and we will schedule your free estimate with a written price before any work starts.

Get the price in writing before anything starts.A real person answers, day or night.
Call now

FAQs

Need Construction help in Long Beach? Licensed & insured · Free in-home estimates response · free estimates
Call (424) 567-7009
Local Service Coverage

Request a Free Estimate in Long Beach

Tell us what you need - Rowan Construction Group Long Beach responds fast. No obligation.

By reaching out through this form, you agree to the terms of our Privacy Policy and agree to be contacted by telephone, text message, or email about your request, including by the independent contractors we may refer it to.

Prefer to text? Text Now
Call Now - 24/7 Dispatch