A Rowan company - serving Long Beach, CA

ECO Window Systems Home Additions & ADU Nationwide

Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

ECO Window Systems Home Additions & ADU: The Long Beach Owner’s Guide

We stock and install ECO Window Systems-compatible window and door units for home additions and ADU projects in Long Beach, with typical installed pricing for addition window packages running $8,000-$25,000 and full ADU window/door systems from $12,000-$35,000 depending on unit count and egress requirements. Most ECO Window Systems inventory orders arrive within 3-5 business days, and we schedule installation the day after delivery. Long Beach homeowners usually discover an issue when the addition’s windows no longer seal against coastal moisture, the sashes stick after winter temperature swings, or they notice frame distortion where the original ECO unit was retrofitted into older construction.

Call (424) 567-7009

Which ECO Window Systems Models This Applies To

ECO Window Systems produces several product lines relevant to Long Beach additions and ADUs: the ECO 5000 Series vinyl double-hung, the ECO 7000 Series casement and awning units, and the ECO 9000 Series sliding and picture windows commonly specified for modern ADU builds. The model number is stamped on the spacer bar between panes, visible when you open the sash and read through the glass edge, or on a foil label in the head jamb. The 5000 Series uses a 2-5/8″ frame depth that conflicts with some 2×4 addition walls unless you order the retrofit fin version; the 7000 and 9000 Series carry a 3-1/4″ depth standard for new construction.

OEM ECO parts come with the full 20-year glass and 10-year hardware warranty, but we also source from C.R. Laurence and Truth Hardware for compatible operators, locks, and balances when ECO lead times stretch. For coastal Long Beach properties within two miles of the water, we specify upgraded stainless steel hardware regardless of OEM or aftermarket, because standard zinc operators corrode within 4-6 years in salt air. The compatibility gotcha we see most often: ECO changed its cam lock footprint in 2019, so pre-2020 units need the older lock body with a different screw spread; measure center-to-center or send us a photo before ordering.

Signs Your ECO Window Systems Home Additions & ADU Is Failing

Professional construction worker installing a new white window frame
Signs Your ECO Window Systems Home Additions & ADU Is Failing
  • Sash won’t stay open or slams shut. The coil balance system has lost tension or the pivot bar has worn. In Long Beach’s marine layer humidity, rust forms on the balance shoe and the nylon cam cracks, especially on south-facing additions that bake afternoons and cool with evening fog.
  • Visible moisture between glass panes. The insulated glass unit (IGU) seal has failed, allowing argon escape and condensation. This accelerates near the port where industrial particulate etches the glass edge, shortening IGU life from 15 years to 8-10 in some Belmont Shore properties we’ve serviced.
  • Frame corner separation or vinyl warping. Heat buildup in dark-colored frames, common on west-facing ADU walls, exceeds the vinyl’s stability range. ECO’s darker bronze and forest green options show this more than white or almond; we document this with photos and recommend heat-reflective exterior laminates on replacement.
  • Air infiltration at the meeting rail or sill. The weatherstrip has compressed or the sill track has worn a groove from repeated sash cycling. On ground-floor ADU units, we also check for substrate settlement that throws the frame out of square, a separate issue that new weatherstrip won’t fix.
  • Operator handle spins without moving the sash. The worm gear inside the casement operator has stripped, usually from over-torquing or seized hinges that overload the mechanism. ECO’s 7000 Series uses a 9/16″ spindle; aftermarket operators with a 1/2″ spindle will strip immediately under load.
BeforeBefore
AfterAfter

Replacement Cost & What’s Included

Component Long Beach Price Range What’s Included
ECO 5000 Series double-hung (per unit, installed) $650-$1,400 Unit, flashing, insulation, trim, disposal of old
ECO 7000 Series casement (per unit, installed) $850-$1,800 Unit, operator, hardware, interior/exterior trim
IGU replacement (glass-only, existing frame) $280-$550 Custom IGU, argon fill, low-E coating, installation
Balance/operator hardware repair $180-$380 Parts, labor, lubrication, function test
Full ADU window/door package (6-10 units) $12,000-$35,000 All units, installation, permits, final inspection
Home addition window package (4-8 units) $8,000-$25,000 Units, installation, weatherproofing, photo record

The range reflects unit size, floor-level access (second-story adds ladder time), and whether we encounter rotted sill or sheathing during removal. Under Clause 1 of the Haven Standard, you receive a written price before any work starts; no change proceeds without a signed change order. Every installation carries our 365-Day Done Right Promise, and the documented photo record shows you the rough opening condition, the flashing sequence, and the finished unit before we leave. We are an independent service provider, not affiliated with ECO Window Systems.

DIY or Call Us?

Professional contractor spreading mortar for kitchen backsplash tile installation
DIY or Call Us?

An owner can safely check the model label, photograph the failed component, and verify the symptom against ECO’s published troubleshooting guide. What goes wrong past that point: vinyl frame units weigh 40-80 pounds each and require two people to set plumb; improper shimming transfers frame stress to the glass and voids the IGU warranty; and California’s Title 24 energy code requires specific U-factor and SHGC values that replacement units must meet, documented on the NFRC label. We’ve been called to Long Beach ADUs where a homeowner’s self-installed unit leaked for six months before the subfloor damage became visible. For IGU-only replacement or hardware repair, the risk is lower, but the 9/16″ versus 1/2″ spindle mismatch we mentioned will cost you a second trip to the supplier. Measure twice, write it down, then build it.

When you’re ready for a written price, call (424) 567-7009 and we’ll schedule a free estimate. We bring sample ECO frame sections so you can see the wall depth and color in your actual light.

Get the price in writing before anything starts.A real person answers, day or night.
Call now

FAQs

Need Construction help in Long Beach? Licensed & insured · Free in-home estimates response · free estimates
Call (424) 567-7009
Local Service Coverage

Request a Free Estimate in Long Beach

Tell us what you need - Rowan Construction Group Long Beach responds fast. No obligation.

By reaching out through this form, you agree to the terms of our Privacy Policy and agree to be contacted by telephone, text message, or email about your request, including by the independent contractors we may refer it to.

Prefer to text? Text Now
Call Now - 24/7 Dispatch