Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
IKO Driveway & Pavers: The Long Beach Owner’s Guide
IKO driveway and paver systems in Long Beach typically run $7,000-$18,000 installed for paver driveways and $3,500-$11,000 for paver patios, depending on substrate condition and pattern complexity. We stock IKO-compatible paver units, edge restraints, and bedding materials for same-day replacement of failed sections across the Long Beach market. Most homeowners discover the problem when individual pavers shift out of plane after winter rain, leaving visible lippage or pooling water that wasn’t there six months ago.
Which IKO Models This Applies To
IKO does not manufacture pavers directly; they produce the asphalt shingle and roofing membrane lines most Long Beach homeowners know from their roofs. When a contractor specifies “IKO driveway and pavers,” they are usually referring to IKO’s Perma-Ever or ArmourZone membrane systems used beneath paver installations, or to jobs where IKO roofing and paver hardscaping were bundled on the same build. The actual paver units are typically sourced from Belgard, Techo-Bloc, or Unilock.
To identify what you have, check the project documentation for the paver brand stamped on the unit edge, and look for the IKO membrane label on any waterproofing layer beneath. Measure the paver thickness: standard concrete pavers run 60mm for residential driveways, 80mm for commercial or heavy-vehicle use in Long Beach’s port-adjacent neighborhoods. The OEM-versus-aftermarket question here is really about the membrane compatibility: IKO’s Cold Gold adhesive and seam tape must mate with the existing membrane chemistry, or delamination follows within two seasons. We stock the IKO-specified bonding products rather than generic substitutes because the thermal cycling in Long Beach’s marine layer punishes mismatched materials.
Signs Your IKO Driveway & Pavers Is Failing

- Paver lippage and rocking. Individual units shift vertically relative to neighbors, usually because the bedding sand has washed out from beneath. In Long Beach, this happens fastest on grades facing the ocean where wind-driven rain concentrates.
- Standing water after light rain. The permeable joint sand has degraded or the bedding layer has compacted unevenly, breaking the drainage plane the IKO membrane was meant to protect.
- Efflorescence blooming on paver faces. White mineral deposits signal moisture migrating upward through the assembly, often from a compromised membrane seam or failed edge restraint that lets water saturate the base.
- Edge restraints pulling away from the perimeter. Plastic or aluminum edging anchors fail when the concrete haunch behind them cracks; this is the first domino in a wider collapse of the laying pattern.
- Sinking near downspout outlets or irrigation heads. Concentrated water flow undermines the aggregate base, creating soft spots that telegraph through to the paver surface. We see this regularly in Long Beach’s older Belmont Heights installations where original drainage was never upgraded.
Before
AfterReplacement Cost & What’s Included
| Scope | Price Range (Long Beach) |
|---|---|
| Partial paver section replacement (up to 200 sq ft) | $2,500-$6,500 |
| Full paver driveway replacement | $7,000-$18,000 |
| IKO membrane repair beneath pavers | $1,200-$3,800 |
| Edge restraint replacement (per linear foot) | $18-$35 |
| Bedding sand and joint sand refresh | $800-$2,200 |
The range depends on three factors: how much of the base must be recompacted, whether the IKO membrane can be patched or must be replaced in full, and the paver pattern complexity (running bond is faster than herringbone or circular insets). Our quotes itemize each line: demolition, base repair, membrane work, paver reset or replacement, joint sand polymeric treatment, and disposal. Under Clause 1 of the Haven Standard, that written price is fixed before any work starts; no change proceeds without a signed change order. The 365-Day Done Right Promise covers the installation, and the documented photo record shows you the substrate condition before we cover it back up.
DIY or Call Us?

What you can safely check: lift one paver at the edge and look for standing water or mud in the bedding layer, which tells you if the drainage plane has failed. You can also measure lippage with a straightedge; anything over 3mm between adjacent units will trip a pedestrian and worsens quickly.
Where DIY goes wrong: resetting pavers without regrading and recompacting the base simply delays the same failure. The IKO membrane beneath requires heat-welded or properly taped seams that demand clean, dry conditions and the correct adhesive for the membrane type; guessing here traps moisture and voids any remaining warranty. The polymeric joint sand that locks the assembly must be installed in specific humidity ranges, which Long Beach’s marine layer complicates half the year.
We carry the full range of IKO-compatible membranes, edge restraints, and bedding materials on our trucks. Call (424) 567-7009 to schedule your free estimate; we’ll lift a test section, photograph what we find, and give you a written price before any work starts.
FAQs
Properly installed paver assemblies with IKO membrane waterproofing last 20-30 years in Long Beach’s climate, though the polymeric joint sand needs refreshment every 7-10 years and edge restraints may need resetting after 12-15. The marine layer accelerates corrosion on aluminum edging, so we specify stainless or heavy-gauge PVC in coastal zones. Call (424) 567-7009 for an exact quote on your refresh - estimates are free.
Individual pavers can be lifted, the base recompacted, and units reset if the substrate is sound and the membrane intact; this runs $800-$2,200 for typical residential sections. If the membrane has failed or the base is saturated, partial replacement is the only durable fix. We diagnose this with a test lift included in our free estimate - call (424) 567-7009 to schedule.
Partial section replacement is usually two to three days: one for demolition and base prep, one for membrane work and paver laying, and a half day for joint sand treatment and cleanup. Full driveway replacements run five to seven days depending on pattern complexity and curing requirements for the membrane adhesive. We do not promise same-day completion on planned hardscaping work; the base must be compacted in lifts and the membrane seams tested, which cannot be rushed without failure. Call (424) 567-7009 for a timeline written to your specific scope.
We stock IKO Cold Gold adhesive, seam tape, and the full range of membrane rolls on our Long Beach trucks, plus Belgard, Techo-Bloc, and Unilock paver units in the common 60mm and 80mm thicknesses. Less common colors or 100mm commercial units typically arrive next business day. Call (424) 567-7009 to confirm stock for your specific repair - estimates are free.
Written by Grant Rowan, Owner, Rowan Construction Group Long Beach at Rowan Construction Group Long Beach, serving Long Beach and nearby areas.







Before
After
Before
After
Before
After